Experience the House
progress

The house is largely build by students. It is the synthesis of undergraduate education and research tempered by the working of a real product.

APRIL 2009

april 2009 | welding beams
  • Slab ground to a polished finish
  • Mechanical closet wall finishes installed
  • Mechanical team finished the HVAC layout
  • Steel water pump rack fabricated and installed
  • Steel beams for Eclipsis System welded to frame
  • LUMENHAUS website schematic designs and site architecture created with MODEA