Experience the House
progress

The house is largely build by students. It is the synthesis of undergraduate education and research tempered by the working of a real product.

MARCH 2009

march 2009 | pouring slab
  • Pouring of the slab. The following day’s temperature in the teens, structural insulated panels used as thermal blankets
  • Installation of roof and wall Structural Insulated Panels
  • LUMENHAUS website conceptualization with MODEA